Jayaru Engineering’s Turnkey Solution at Morrison’s Pharmaceutical Factory, Homagama

In the dynamic landscape of pharmaceutical manufacturing, Jayaru Engineering made a substantial impact with the successful completion of a comprehensive project at Morrison’s Pharmaceutical Factory in Homagama during 2019 and 2020. The undertaking featured the installation of two state-of-the-art 4,000 kg/hr oil-fired steam boilers, along with a feedwater tank and a towering 100 ft chimney, all executed under the expertise of Forbes Marshall.

Beyond the boilers, Jayaru Engineering played a pivotal role in enhancing operational infrastructure, extending its influence to the installation of sophisticated steam distribution, chill water distribution, compressed air distribution systems, and soft water/treated water distribution systems. This project not only showcases Jayaru Engineering’s technical prowess but also its commitment to providing turnkey solutions that optimize efficiency and performance in the pharmaceutical manufacturing sector.

Leave a Comment

Your email address will not be published. Required fields are marked *